What is Casa Roble Biscayne Park?

Casa Roble Biscayne Park is the name of the project at 625 NE 115th Street: a 14,400 SF double lot (100 by 144 feet) in Griffing Biscayne Park Estates, about twice the size of a typical lot on its block. It was secured off-market by Nautilus Biscayne LLC and is planned for a new single-level modern family home.

Where is Casa Roble Biscayne Park?

At 625 NE 115th Street, Biscayne Park, FL 33161, in Miami-Dade County. The lot is in Griffing Biscayne Park Estates, on a street with a 60-foot right-of-way and a landscaped median. Biscayne Park is a small village between Miami Shores and North Miami.

What will be built?

A single-level modern residence with 5,200 SF of living space, plus garage and outdoor living, 6 bedrooms, 7.5 baths, walls of glass and a resort pool, set in a garden under mature trees. The finished floor sits at BFE + 1 for flood readiness. Final design rests with the selected architect: Atelier 305 or Suma Arquitectonica.

How big is the lot compared with nearby lots?

The lot is 14,400 SF: a 100 by 144 foot rectangle. A typical 144-foot-deep lot on these blocks has about 54 feet of frontage and roughly 7,800 SF, so this lot is about 1.8 times that size.

What flood zone is 625 NE 115th Street in?

FEMA flood zone AE, with a base flood elevation (BFE) of 7 feet. The new home's finished floor is planned at BFE + 1, one foot above the base flood elevation.

Has the lot been surveyed?

Yes. A boundary survey by Blanco Surveyors (job 22-310), revised June 13, 2022, shows no encroachments.

What happens to the existing cottage?

A 1930 cottage sits in the middle of the lot today. It stays rented until permits issue, then it is cleared to make way for the new home.

When will it be finished?

Completion is targeted for 2027. The plan is to reach shovel-ready, with permits issued, in about 5 months, then build. The schedule depends on Village approvals and construction, so dates can move.

Why Biscayne Park?

Known as the Coconut Grove of the North, the Village is lush, historic and tree-lined, with quiet streets and a close community. It is minutes from Miami Country Day School, Miami Shores Country Club, Biscayne Blvd shopping, the Design District and Wynwood. The Village median sale price rose 45% year over year, and 25+ new homes are built or underway.

What is near 625 NE 115th Street?

Approximate off-peak drive times: Miami Country Day School 3 minutes (0.6 miles, about 12 minutes on foot), Miami Shores Country Club 4 minutes, Whole Foods, Home Depot and Costco on Biscayne Blvd 5 minutes, the Design District 12 minutes, Wynwood and Bal Harbour Shops 15 minutes, Opa-locka Executive Airport 15 minutes and Miami International Airport 20 minutes.

Is Casa Roble Biscayne Park part of the Village of Biscayne Park?

No. It is a private home project of Nautilus Biscayne LLC. It is not affiliated with the Village of Biscayne Park government (biscayneparkfl.gov), and it is not the Casa Roble listing at 12625 SW 78th Ave in Pinecrest.

Is the permit path confirmed?

Yes. The Village of Biscayne Park's Assistant Building Official confirmed the approval sequence in writing on September 28, 2026: plans, Planning & Design Board, septic approval, then Building Department review.

How long does permitting a new home in Biscayne Park take?

For this project, the Village's Assistant Building Official confirmed a four-step sequence: architect and engineering plans (months 0 to 2), Planning & Design Board review (months 2 to 3; the board meets every two weeks), septic approval by DERM and the Health Department (months 3 to 4) and Building Department review (months 4 to 5, with review cycles of 5 to 10 working days). The target is about 5 months to permits issued. Review times are set by the Village and can vary.

Who is behind the project?

Nautilus Biscayne LLC. Its managing principal is a partner at a prestigious global consulting firm, with 20 years of leading programs worth hundreds of millions for Fortune 50 clients, a double engineering degree and an Ivy League MBA. Its Miami development partner is a licensed Florida real estate broker with more than ten years and over $127 million in Miami luxury real estate transactions, and has four projects underway in Biscayne Park today.

Is the investor round open?

No. Casa Roble was fully funded in under 37 days and the investor group is complete. To hear about the next project first, join the list at the bottom of the home page.

Can I visit the property?

The existing cottage is rented, so please do not visit or disturb the tenant.

321-533-5676